What is shown on a demolition plan?
By definition, a demolition plan is a document that entails the entire strategic steps to be followed by demolition contractors to ensure that the building or structure being brought down does not harm the environment and people living nearby.
What needs to be noted on a demolition drawing?
All addresses and block & lot numbers must be provided and the property lines must be bold and clear. 2. Basic structure of the building being demolished must be provided, including general sizes and types of main structural members. A general structural lateral system must be identified as well.
What is a demo plan in construction?

Demolition means dismantling, razing, destroying or wrecking any building or structure or any part of it by pre-planned and controlled methods. Based on demolition surveys, a demolition plan is prepared. This demolition plan is produced with the application for approval of demolition to the local authority.
What things must be planned prior to the demolition?
Demolition projects often involve multiple issues from permits, inspections, and dangerous materials to dealing with the rubble that results. Planning is key, from having utilities disconnected, to a clear map of what is to be demolished, to deciding how to handle materials that you want to salvage or sell.
What are the steps to demolishing a building?
Demolition Stages
- Stage 1: Safety measures.
- Stage 2: Preparatory Dismantling.
- Stage 3: Supply and installation of explosives.
- Stage 4: Explosion.
- Stage 5: Material Handling and Recycling.
What kind of plan should be set up prior to demolition?

A “fire plan” should be set up prior to beginning a demolition job.
What is the purpose of demolition?
Demolition (also known as razing, cartage, and wrecking) is the science and engineering in safely and efficiently tearing down of buildings and other artificial structures. Demolition contrasts with deconstruction, which involves taking a building apart while carefully preserving valuable elements for reuse purposes.
What is a demolition test?
The specialist demolition test includes questions on specialist demolition knowledge. In other terms, it is a security check to access construction sites and is a must for construction students. The test is conducted in accredited centres on a touch screen based Personal Computer.
What are the three 3 methods of demolition?
Demolition Techniques
- Manual Demolition: Manual demolition is also known as hand demolition.
- Wrecking Ball Method:
- Pusher Arm Technique:
- Thermic Lance Technique:
- Concrete Sawing Method:
- Deliberate Collapse Method:
- Pressure Jetting Method:
- Bursting: